EIA / EMP

Home   /   Environment Impact Assessment and Environment Management Plan

Projects Documents
Draft EIA/ EMP Report of Rongnichu Hydro Electric Project for enchancement of power station capacity from 96 MW to 115 MW and expand to 120 KLPD and absolute Alcohol (30 KLPD) along with cogeneration power plant (3.5 MW) Draft EIA (English) Posted on 11/02/2020
» See Draft EIA new
The Department of Tourism, Government of Sikkim, proposes to construct a passenger ropeway between Dhapar (Yangyang) and Bhaleydhunga (Ravangla), in South Sikkim. »  Public Hearing Notice / Salient Features  | English |
»  EIA study report | English |
M/s ESVEEGEE BREWERIES Pvt. Ltd., Manpur –South Sikkim proposes to establish/ operate existing grain based Distillery (ENA/Rs 60 KLPD) and expand to 120 KLPD and absolute Alcohol (30 KLPD) along with cogeneration power plant (3.5 MW) »  Public Hearing Notice: English | Nepali
»  Executive Summary: English | Nepali
»  EIA/ EMP: Read Draft
Roads & Bridges Department, Government of Sikkim, proposes Improvement, Re-construction & development of Nayabazar (Akar bridge)-Namchi State Highway (SK-02) in the state of Sikkim, funded by Asian Development Bank (ADB) covering a total length of 19.7 km in the South District of Sikkim. »  Salient Features  | English | Nepali
»  Executive Summary on EMP and EIA for the project | English | Nepali
520 MW Teesta-IV HEP - NHPC Ltd.
EIA and EMP Executive Summary
» English ¦  Nepali ¦ Bhutia ¦ Lepcha
96 MW Lethang HEP West Sikkim - Kalpan Hydro
97 MW Tashiding HEP - Shiga Energy Pvt. Ltd.
99 MW Ting Ting HEP - T T Energy Pvt. Ltd.
66 MW Rangit-II HEP - Sikkim Ventures Pvt. Ltd
120 MW Rangit-IV HEP - Jal Power Corporation Ltd.
500 MW Teesta-VI HEP - Lanco Energy Pvt. Ltd.  
51 MW Bhasmey HEP - Gati Infrastructure Ltd.  
120 MW Rammam Stage-III HEP - NTPC Hydro Ltd.
       
eia emp

EIA and EMP

Environment Impact Assessment (EIA) and Environment Management Plan (EMP) of developmental projects in Sikkim